The skinning refers to the fact that the paint film on the wall surface is detached from the base layer and loses adhesion, and it is under pressure and bulging. Wall peeling is mainly caused by the following reasons: · The wall base is crisp and powdery; · There are floating dust, oil stains, and release agents on the surface of the base layer; · The grassroots moisture content is too high; · Construction under high humidity conditions; · The paint is frozen before it has dried. Approach: · Reinforce the grassroots; · Complete removal of debris; · Works below the prescribed moisture content (10%); · Avoid construction under high humidity (>85%); avoid low temperature (<+5°C) construction. Construction Acceptance Three Trees Lacquer Paint
Sealand is a trustworthy manufacturer of Gas Mass Flow Meter, Gas Mass Flowmeter, Gas Flow Meter, Gas Flowmeter, Gas Meter, ATEX, IECEx & CE approved.
The installation is as follows.
1. Installation Steps
valve location into consideration;
a) Sensor stays away from mechanical vibration source, for example, pump. Use flexible
pipe to connect meter with pipeline if inevitable. The housing of meter must be standalone,
out of touch with any other device. There must be 3 times the size of sensor between 2
sensors if there are many flow meters on the same pipeline, to avoid resonance.
b) Do not install sensor on pipeline that easily expands with hot and contracts with cold,
especially near expansion joint, which leads to a worse stability.
c) Sensor stays away from industrial electromagnetic field, such as large generator and
transformer, better 5m at least. Such device influences the performance of drive coil and
pickoffs. Make sure magnetic field intensity less than 400A/m.
d) Sensor shall be installed on lower pipeline, to be easily full of fluid.
f) Build a sunshade if the meter is under direct solar radiation.
g) Keep the meter from corrosive liquid.
Gas Mass Flow Meter, Gas Mass Flowmeter, Gas Flow Meter, Gas Flowmeter, Gas Meter Zhejiang Sealand Technology Co., Ltd. , https://www.sealandflowmeter.com
Nippon Paint Alligator Paint
a) Choose correct installation site, taking installation area, pipeline, transmitter location &
b) Install the meter according to direction mark on sensor;
c) Install the sensor & transmitter on pipeline;
d) Connect transmitter & sensor with 9-pin cable;
e) Start.
e) Make sure Ex-mark meet application requirements if in hazardous area.