Renovation seems to be a scratching issue for most people. In fact, Xiao Bian thinks that it is not so scary to imagine. It is important to master some techniques and learn from others' experiences. The experience that Xiao Bian has to say is very useful. It can help you, and I hope your beautiful home will welcome you soon. waterproof 2. The waterproof project should be done after the concealed project construction is completed and accepted 3, After the completion of waterproof construction to do two water storage test 4, the bathroom waterproof layer should not be less than 1.8 meters 5, floor drain, Yin Yang angle, pipelines and other places to do more waterproof 6, floor drain to use deodorant floor drain 7, hot and cold water left hot right cold 8, try not to walk from the ground 9, cold water pipe in the wall should have a protective layer of 1CM, hot water pipe is 1.5CM, so the slot to open deep 10, PPR pipe is installed to consider the thickness of the tiles , so that the pipe will not be exposed 11, only a few minutes to cook, wash vegetables for a long time, bucket must buy big 12, leading and counter basins must be matched, if not, it will not be installed. 13, toilet installation can not use cement , use silicone 14, toilets, taps should be carefully protected after installation 15, to consider the toilet pit when buying a toilet 16, the washing machine to consider whether it is drainage or drainage 17, best not to install the bathroom phone, easy to damp 18, The mirror in the bathroom should first consider the size, otherwise the mirror headlight is very easy to install. 19, bathroom pipe is best to leave the access hole 20, weak electricity can not be worn in the same tube 21, left zero, right phase grounded 22, the power socket is 300 meters away, and the switch is 1.4 meters 23, switch not installed behind the door 24, a lot of sockets should be good 25, high-power electrical appliances with 16A socket , such as electric oven 26, the cassette should be used well 27, cassette must be matched with the panel, otherwise it may not be installed 28. The cross-sectional area of ​​the wires in the PVC wire conduit must not exceed 40% of the cross-sectional area of ​​the wire conduit 29, bedroom air conditioning do not face the bed 30, air conditioning holes to consider outward tilt, otherwise the rain will come in 31, lights try to consider dual control 32, the best bathroom to install splash socket 33, on the balcony to consider a socket 34, wire troughs should be horizontal and vertical, row photos, later use it 35. The public flues must install the reverse valve 36. The bought electrical appliance must allow workers to read the manual 37. Instructions and warranty cards must be kept Air Conditioner Entrance Renovation Socket Toilet Switch Electric Bathroom Mirror Lights Toilet Waterproof Toilet Door Dimensions Bathroom Tiles Bathroom Dimensions Bathroom Doors Bedroom Tiles Glue Balcony Tiles Bedroom Lamps Renovation seems to be a scratching issue for most people. In fact, Xiao Bian thinks that it is not so scary to imagine. It is important to master some techniques and learn from others' experiences. The experience that Xiao Bian has to say is very useful. It can help you, and I hope your beautiful home will welcome you soon. ...80 couples wedding room petty bourgeoisie marriage room fashion fashion show a member of the exclusive cash discounts Mediterranean style blue + white mosaic even ... 1, waterproof construction should use waterproof film coating. 2. Waterproofing works should be done after the concealed construction is completed and accepted. 3, after the completion of waterproof construction to do 2 water storage test. 4, the bathroom waterproof layer should not be less than 1.8 meters. 5, floor drain, Yin Yang angle, pipelines and other places to do more waterproof. 6, floor drain to use deodorant floor drain. 7, hot and cold water left hot right cold. 8, try not to walk from the ground. 9, cold water pipe... First, the waterway project 1, waterproof construction should use waterproof coating film. 2. Waterproofing works should be done after the concealed construction is completed and accepted. 3, after the completion of waterproof construction to do 2 water storage test. 4, the bathroom waterproof layer should not be less than 1.8 meters. 5, floor drain, Yin Yang angle, pipelines and other places to do more waterproof Home-installed hydropower construction is related to the use of the next few decades, not sloppy, once a problem occurs, the loss is heavy, here put forward some suggestions for construction! Super Practical: User's 37 Decoration Experiences 183X61CM Eco-friendly TPE Yoga Mat
Thermal Plastic Elastomer (TPE), elsewhere known as
thermoplastic rubber, is a copolymer class or a mix of polymers. Usually, the
polymers mixed to create TPE material are plastic and rubber. Anyway, the thing
with TPE is that it consists of materials with thermoplastic and elastomeric
qualities. So, TPE YOGA MATS are constructed from thermal plastic elastomers
and other material. The fusion with other materials is done with closed-cell
foaming under high temperatures. After this process, the TPE yoga mat is easier
to clean and is resistant to various microbes.
Also, the TPE material has a few advantages, such as
increased eco-friendliness, better elasticity, and recyclability; which make
the TPE yoga mats more eco-friendly than PVC yoga mats. You see, the TPE
material has some attributes of non-PVC, non-toxic, and non-heavy metal
materials. This kind of profile makes TPE yoga mats suitable for both travel
and house use.
1, waterproof construction should use waterproof coating Previous
Decoration regret and precautions - ceiling Next
The most classic decoration experience (mason articles)
submit
TPE yoga mat,yoga mat
Omega Eco Deco Materials(GuangDong) Co., Ltd , https://www.rococfloor.com