Basically the big stage is divided into three before closing the house, after the house is collected, the basic decoration is completed. A lot of work before closing the house must be completed within this time period. Of course, if you are not in a hurry, you can also take it easy! Before the collection: 1 Looking for a decoration team (due to the shortage of funds, so he sought a colleague to use a decoration team, light work accessories) 2 fixed tiles 3 Flooring 4 Set wooden doors 5 fixed cabinets 6 set the water heater (this should be considered well in advance, is the use of gas or electricity. I go to large and medium, Gome inquire about the price, sales are said to be free to come to the door design) After the house 1 The first measurement of the cabinet (this must be on the front, because it determines the hydropower of the kitchen) 2 Into the tile for a long time, (Current tiles are usually sent to the downstairs only, but also to find someone to move, my home tile is not much, is my own move.) 3 door measurements (because we have to level the floor, so the wooden door manufacturer's decoration staff asked to use the horizontal line as a benchmark. At that time, no work was started, so the master later retested it once) 4 Hydroelectricity reconstruction, we must think ahead of time to improve the program (I feel that this must find a hard decoration staff, my family's last to find the shower faucet can not be installed, very troublesome! Because the national standard is two nozzle spacing 15cm, and certain To be on a plane, the two pipes in my house were found to measure 15.5cm, and the direction of the nozzle was a little to the left and one to the right.) Three days 5 Do one day brushing for bathroom waterproofing, dry one day, and have a water shut-off test for at least one day. 6 Tiles, one kitchen and one bathroom, a total of 10 square meters, about a week 7 Sanitary ware, fixtures, fixed bathroom and kitchen hardware 8 The floor leveling of my home is about 55 square meters, and there is no way to do it. After spending two days before and after, the master still got up and working in the middle of the night!! 9 switch, socket, because my home switch socket is my own change, so you must first remove the wall before you brush it! 9 Brushing the wall for a week (when listening to the big lecture, I heard that I don't need 821 now, so I asked the decoration team to change it to be easy to scratch. The foreman said that the change can be made, but we need to add 3 yuan per square meter. We count A total of 200 square meters about my home, so down is 600, I think it is not worthwhile, then lp said it still does not change, but unfortunately had to be so!!! Later I went to the Oriental home 18 Shilidian found 821 is 18 bags, and easy to scrape Ping is a bag of 40, and my family last shared less than 9 bags, which is less than 300 pieces!!!) 10 Installing Wooden Doors 4 Days 4 Tips 11 Install the sanitary ware one day (best of them all, one of them is the bathroom cabinet faucet in my family. The bathroom cabinet manufacturer has installed it, but it is not responsible for the problem.) In addition, the shower rod in my house is very long. There was no such concept before, and the installer first discovered the problem, and also found that the toilet wall distance was not correct, so it was not installed for the first time. Two days later, the manufacturers switched to it, and the third day the installer came. When the toilet was installed and the shower was installed, it was found that the water inlet was not suitable for the faucet, and it could not be installed. The result was not pretend! Finally, it was installed by the decoration team, and the copper pipes were exposed on the outside. ..) 12 Installing Lights and Hardware Installation One Day 13 Install floor one day (2 people) 14 Installation of cabinets, hoods, cooktops, sinks a day After the completion of the basic renovation 1 Cleaning 2 Selected furniture Entrance decoration children's room decoration square meter decoration wooden door home decoration toilet switch floor tile cabinet door kitchen cabinet door bathroom design bathroom waterproof bathroom waterproof price bathroom tile bathroom door floor tile tile price kitchen tile Nylon Garage Door Rollers Menards,Nylon Ball Bearing Garage Door Rollers,Replace Garage Door Rollers With Nylon,Garage Door Nylon Roller Replacement HANGZHOU KUNTAI HARDWARE CO., LTD. , https://www.hzktwj.com
The decoration of my house is almost a month away, and the basic decoration has been basically completed! Looking back at the hardships of the past month, I feel that the most painful thing is the order of renovation, that is, the arrangement of time! The whole process is very tense. Say my home renovation order!