The installation of the shower room is mostly on-site measurement, customized according to customer requirements, and the industry is called one-stop service. However, as the owner, you should also understand the installation steps of the shower room. Xiaobian has arranged some installation steps for the shower room, I hope to help the owners:

Install the bottom basin: combine the bottom part and adjust the level of the bottom basin to ensure that there is no water in the basin or the bottom of the basin. The hose can be telescoped with distance, and the bottom of the basin is firmly connected to the floor drain.

Test and protection: After installation, test water test is needed to ensure unimpeded water flow. Find and punch: Use a pencil and a level to determine the drilling position of the aluminum against the wall and punch the hole with a hammer drill.

Install the aluminum: Knock on the rubber in the hole and lock the aluminum bar to the wall with a screw.

Fixing the glass: Lock the glass to the hole in the bottom basin and fix it with screws.

Install the top tube: Find the corresponding position drill hole above the fixed glass, install the fixed seat and connect the top tube. Secure it to the top of the glass with a bent sleeve.

Installation rack: Align the position of the mounting frame, tighten the plate nut, and fix the laminated glass to maintain vertical and horizontal. Be careful to waterproof under the fixed glass of aluminum.

Install the movable door: Install the hardware of the movable door and install the hinges at the reserved holes of the fixed door. After installation, adjust the position of the shaft of the lotus leaf until the door feels the best.

Waterproof: Install suction strips or water retaining strips on the side or below the glass as required. Use aluminum mesh to seal the seam between the aluminum and the wall, glass and bottom basin.

Commissioning and fastening: Check whether all parts are comfortable and smooth, and find problems in time. After adjusting, tighten the corresponding screws to make the whole shower room firmer.

Finishing work: The decorative aluminum strip is stuck in the wall-mounted aluminum material to ensure that the appearance is neat and generous. Finally, wipe the entire shower room with a rag.

Installation of the whole shower room

One: Determine the installation position of the whole shower room, adjust the foot screw of the bottom basin, find the level of the bottom basin, and connect the water pipe; then carry out the water discharge test of the bottom basin to check whether there is water leakage. (If you wait for the installation and then release the water test, once the water leak is found, the repair is more complicated.) Fix the back plate and shower screen with stainless steel screws on the back of the bottom basin.

Two: Assemble the fixing pieces on both sides, also fixed with stainless steel screws.

Three: Assemble the front side shower screen to fix the glass, and insert the sealing strip into the gap between the glass and the frame on both sides.

Four: Hang the activity door, assemble the top cover, and seal the edge with the special mildew glass glue of Dow Corning. Connect to the power supply, try the computer version

Sixth: The junction of the hot and cold water port is applied with a 90-degree pure copper elbow and a water supply connection to the wire, so as to avoid direct water supply to the wire to cause the water supply to be poor. Water supply trial, check for water leaks.

Seven: Insert the sewer pipe into the sewer pipe, seal the drain port with glass glue, and install it.

In addition, the installation of the whole shower room, but also keep in mind the following three points:

One: to ensure the smooth running track of the pulley, add some lubricant or peanut oil when the push and pull is not smooth;

Two: When the pulley of the track shower room is loose or falling off, it is necessary to find the maintenance personnel to adjust the effective load of the movable door to the movable door. Then use the paper towel to moisten the foreign matter in the track with the peanut oil to ensure smooth sliding; avoid the impact of the force. Doors, so as not to cause the movable door to fall off;

Three: Do not hit the glass with sharp hard objects, especially the four sides and four corners.  

Komatsu Undercarriage Parts

Komatsu Undercarriage Parts,Undercarriage Parts For Excavators,Komatsu Excavator Parts,Caterpillar Undercarriage Parts

JINING SHANTE SONGZHENG CONSTRUCTION MACHINERY CO.LTD , https://www.sdkomatsuexcavatorparts.com

Posted on