For 80, the decoration is really a profound knowledge, new houses do not understand, not to mention what the second-hand housing demolition reform. Many students are very confused, how to arrange the order of the radiator transformation and the order of hydropower reform. Here I introduce to my family my own experience about the process, as well as the grasp of some time, to help everyone smooth the decoration.

1. First of all, it is better to measure the radiator engineer and the hydropower engineer on the same day and determine the renovation plan. Because these three projects all involve the laying of pipelines, if it is not well arranged, it may happen that two pipes must be laid crosswise. (This is definitely not okay!), so it is advisable to call together the three masters first. Which pipe goes straight through the middle of the room and which pipe bypasses the house.

2. Make arrangements in a unified manner, determine a good plan, and design the plan to bring a few red chalks to the scene on the day. When the discussion is good, immediately mark the walls with the chalk (not only what should be marked when marking, but also Mark the approximate location, how many meters from the left wall, how many meters from the ground, etc.), although the professional master will also make a record, but directly on the scene to make a clear reminder can definitely better prevent mistakes.

3. After the design plan is completed, try to change the hydropower first and then change the radiator. Because of the new house, many radiator pipes are laid from the ground. However, it is sometimes impossible to open the tank (especially Electric), so it is easy to break the plumbing tube. Therefore, first change the hydropower, and then change the radiator, even if you accidentally damage the radiator tube is also very easy to repair it.

4. In addition, it is recommended that before the masters come to the door, they should first preliminarily make a general plan according to their needs. If you are waiting for the master to come in and think about it again, it will definitely delay the time, and it's easy to make an unreasonable design because of the tight time.

Because many products are produced by the construction period, and some come early, people can not measure, and some late, affect your production schedule. Therefore, the measurement time must be mastered.

Measures for Measurement in Demolition and Modification of Covert Projects

1, hydropower measurement budget

2, floor measurement: arrange floor manufacturers to do the first measurement

See if the ground needs leveling

3, door measurement : security door and wooden door measurement

If you want wooden door manufacturers to install window covers and gargles, they should be measured together when the wooden door manufacturers measure them, and they should be installed at the same time when the wooden door is installed.

The standard door opening has a standard size range. When the master measures the door opening, if it is a standard door opening, he will record the size of the door opening and go back to size the material; if it is not the standard size range, he will generally have you. Appropriately add money (ten pieces, twenty pieces); if it is too much, he will suggest that you let the decoration team modify it, and give you a certain size, this size you must pay attention, do not let workers give You are doing poorly. If there is a socket behind the door, be sure to remove it. Production period 25-30 days

4, the first measurement of the cabinet:

1. Check if the position of the socket outlet affects the installation of the hood in the future;

2, see if the location of the water meter is appropriate;

3, to see if the position of the inlet is convenient for installing the sink later.

Before the start of hydropower, it is best to order cabinets and complete the first door-to-door measurement of the cabinet. Because the cabinet design will give you some advice on the transformation of the water circuit (including the location of the water and power outlets) from the perspective of the cabinet, these are often not considered by the water circuit workers.

Especially for classmates with "L" and "U" shaped cabinets, they must pay according to the actual measured size of the scene. The design of the cabinet is based on a relative overall size and basically belongs to the maximum size.

The natural gas pipe should be moved to the lower cabinet and the water meter should be moved to the lower cabinet so as to maximize the space for the countertop. Natural gas can be found by the gas company to move the watch and control. If you want to buy a new water heater, the water heater worker can also change it, which is more convenient.

Decoration construction knowledge construction acceptance