Today's LED splicing screen LCD monitor has optimized the weight of the chassis, but how to install it more scientifically and efficiently is very necessary, here to introduce you, LED splicing screen installation skills, to more professional and efficient work efficiency Serve customers, save time from bit by bit, and increase product added value. In the eyes of a highly efficient installation engineer, there are three installations that are especially important. It is summarized into three main points of the installation process. That is, the bracket is installed, the splicing screen is installed, and the equipment is installed. LED splicing screen installation skills Perhaps, before installation, we all know the most basic safety protection environment and safety measures. First of all, the protection ground is necessary, as well as the “support†of some leakage protection devices. Here, the basic security protection precautions are not described here. Mainly talk about the technique of splicing a large screen, which is composed of a liquid crystal splicing unit, an image control processor, a control software, and a wire. When the engineer arrives at the installation site, first check the goods list to check the accessories in single screen quantity. More project installation requirements design drawings, screens and the size of the actual environment. Assembling the splicing screen unit, the splicing screen unit is composed of a liquid crystal single screen, a movement, and a fixed bracket. The splicing screen unit is assembled first, and the liquid crystal screen is placed flat on the soft mat and face down, and the movement fixing frame is divided into two parts. On the side, fix the fixing frame on the LCD screen with screws, and fix the movement in the middle of the fixed movement fixing frame. If the LED splicing screen cannot maintain balance itself, you need to fix the lever to help ensure the verticality as much as possible. The bracket is made up of each bracket unit, so each bracket is flexible left and right, which makes it difficult to ensure that each individual bracket is completely above the same plane. The fixed tie rod comes in handy at this time, and it is fixed back to the stable wall. What if I don't have space above the installation? Good solution! Adjust the tie rod to the horizontal position or 360 to rotate it to the rear to hang on the load-bearing rod, then screw the panel onto the screw. When adjusting the panel, adjust the height as much as possible, and then adjust the movement to the left or right or the front and back. Let's talk about wiring, after the installation, connect all the equipment's lines, including power lines, VGA, video signal lines, HDMI high-definition video lines, etc., as well as power-on debugging splicing wall software. The signal output lines should correspond to the serial numbers (such as the VGA splitter, there will be a conversion head). After the wiring is completed, the power is tested. After the screen is normal, the important part of the installation is ushered in: the debugging control software. First, the controller must follow the RS485 communication protocol, insert the RJ45 cable of the command controller into the RS485 interface, and then the computer. Install the USB to RS232 driver, and then find the serial port COM port in the "Device Manager" of "Hardware" in the "My Computer" property. Then connect the power cord and turn on the switch. Install control software on your computer. In the specific operation software, basically the installation is done. In summary, bracket installation, splicing screen installation, control equipment installation are the three main parts of the installation, I believe that with the installation of the system, we can certainly solve a lot of confusion and trouble encountered during the installation process, the installation engineers are The installation experience of absorbing and absorbing in the practice process will make you more comfortable. In addition, the air conditioning and vents suitable for ventilation are also necessary equipment for the splicing wall to prevent the screen from being overheated and damaged. WENZHOU DIYE VALVE&FITTINGS CO.,LTD , https://www.diye-valve.com
[ Huaqiang Security Network News ]