Hydropower is an especially important part of the home improvement process. Once it is installed, it is very easy to cause problems in the future. Therefore, before the construction, we must learn more about hydropower and we can do a good job of hydropower to facilitate future life. Today Xiao Bian gave everyone a summary of what hydropower installation must know!

First, before the construction, the decoration company needs to provide detailed construction drawings of strong electrical, weak electrical, water supply and drainage design.

2. It is forbidden to expose the wires. It is forbidden to lay the wires directly in the wall, in the floor, under the floor or on the ceiling.

Third, when wiring, it is necessary to separate the strong and weak currents, switches, electrical sockets, and air-conditioning sockets. Also note that the bottom of the switch socket must be horizontal and vertical so that the back panel installation does not occur. Smooth situation.

Hydropower installation hydropower acceptance hydropower stage

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

PVC Foam Board

PVC Foam Board,PVC Foam Sheet,Plastic Foam Board,PVC Foam Board Sheet

Linyi Fengzhize Trading Co., Ltd. , https://www.fengzhize.com

Posted on