Living room decoration is the focus of home decoration, many people do not understand the bathroom renovation do not know what the bathroom renovation steps, bathroom renovation steps are the key to bathroom renovation, many people do not understand the bathroom renovation steps, this article told in detail Everyone has 12 steps for bathroom decoration and precautions. Steps to decorate the bathroom 1, first design the wash basin, toilet, water heater, bath or shower position and size, and then design the water circuit, it is best to draw a design floor plan; 2. Lay good water, electricity and heating pipes according to the drawings, then clean the floor and level the floor with cement mortar; 3, start to do the ground waterproof layer, the coating should be uniform, thickness ≥ 1.5mm. Pay attention to the dead angle during construction, between the wall and the ground, between the water pipe and the ground. The walls shall be waterproof and refer to the ground. The waterproof layer on the side walls shall be ≥20cm high. There shall be bathtubs. The waterproof layer shall cover all parts where the shower can be sprayed. Of course, the four walls of waterproof can also be done at the top of the wall, and the bathroom roof can be made waterproof better; 4, after the waterproof construction is completed, to block all the bathroom sewer, in the bathroom door to build a "dwarf wall" for water injection test, water injection height of about 10cm. After 24 hours inspection, if there is no leakage around the bathroom wall and the ground, the waterproof quality of the bathroom is very good. On the contrary, it is necessary to identify leaks and carry out repairs; 5. After the water-retaining test is completed, dry it for 5-7 days, and then apply a layer of cement mortar on the waterproof coating. After the protective layer of cement mortar is dry, it can be tiled. The floor should have sufficient inclination to the floor drain direction to facilitate drainage. Tiles on the floor should be non-slip, waterproof, and the wall tiles should not be able to absorb water, otherwise there is a color difference. Tile sealant is better than the color, not too shallow or too deep. Finishing the wall tiles can make normal decoration on the ground; 6. The size and height of the washbasin countertop should be moderate (different from the height H75-85cm), the under counter basin is easy to clean. Basin waterway requirements: hot and cold water from the ground 50cm, hot and cold water spacing 10-15cm, it is best to ensure the hot and cold water in the center of the basin. If water heaters and wash basins are too far apart to provide hot water, consider another solution, such as installing a small wash basin under the water heater in winter; 7, the best water heater installed on the load-bearing wall, strong. It is best to leave enough space between the two ends of the water heater and the wall for easy access. In the case of a bathtub, the volume of the water heater must match the volume of the bathtub by more than or equal 2:3; 8, buy a toilet to consider the election before the water or after the water, to consider the toilet between the water hole and the distance between the wall, to take into account the thickness of the wall tiles. Toilet flushing effect is better, to save water, to noise; 9, wash basin above the countertop to leave the socket (hair dryer, razor, etc.), leave the socket below, keep the socket near the toilet (body cleaners, etc.), washing machine on the toilet, then also leave the socket. Socket quality is better, to avoid the shower spray direction, with a waterproof cover; 10. If there is a floor cabinet with stainless steel high, waterproof, easy to clean; 11, the bathroom lights should not be dark should be light, use incandescent or natural light, lights, mirrors, doors to prevent fog; 12. The lighting switch of the bathroom should be installed on the outside of the door. The switch of the mirror front light, ventilation fan, and bathroom heater should be in the bathroom. The selection of electric wires is determined according to the total power of the electrical appliances in the bathroom. Bathroom decoration process notes First, the waterproof layer must not be damaged. If there is damage or no waterproof layer, waterproof should be done first, and 12 hours of water leakage test. Second, the sanitary ware is firmly fixed and the pipeline interface is tight. Third, pay attention to product protection and prevent bumping sanitary ware. Fourth, sanitary ware must be selected in advance, do not wait until the late decoration. This will produce unexpected troubles. Xiao Bian summary : The above is Xiaobian today to provide you with relevant little knowledge on the steps to decorate the bathroom , if you have no understanding of the bathroom renovation steps can refer to this article, I hope to help everyone. If you still want to learn more exciting content, please continue to pay attention to this site to understand! Bathroom Decoration Bathroom Small Bathroom Decoration Nylon Nut,M6 nylon nut,M12 nylon nut,Nylon nut and bolt Jiangsu Minglu Stainless steel Co.,ltd , https://www.minglufastener.com