(1) When calculating the selected tool, if the evaluation function F of multiple tools is equal and is the minimum value, the tool with the largest mean square error with the useless remaining life g j is used, and the total tool life utilization rate is significantly better. Optional service life of a tool with a minimum F, and the useless remaining life of the former is concentrated to a small number of tools, which is beneficial for later use. The table shows the results of the first method. However, in addition to the service life utilization, the tool lag time should be considered in the application. This goal sometimes contradicts the first method. What method to use depends on the specific situation. (3) Both Cases 4 and 5 used 30 sister knives. The number of required tools was 76 and 200, and the calculation time was 36 s. It is relatively rare to have up to 30 sister tools in a system in a FMS. Therefore, the calculation time of the algorithm can fully meet the requirements. The control of the tool management of the FMS uses the mean control algorithm to have a satisfactory effect on the optimization aimed at reducing the unused life of the tool. This method has a large possibility to find a global optimal route from a global perspective. The calculation method is simple and suitable for online or off-line control or optimization. Previous page 15 inch length with 3 inch width helix auger earth anchor. Package quantity: 1pc Earth Anchor,Earth Screw Anchor,Paint Earth Anchor,Earth Screw Hebei Honde Plastic & Metal Co., Ltd. , https://www.foundation-system.com
Powder coated red color. Weld eye ring for installation and tie off. Firmly welded helix.
Easy installation by hand or machine
Screw into the ground to guy down tents, canopies, storage buildings, fencing, playground equipment, trees, as well as more other guying uses.
Through these examples, we found: